Steeple and Ice Cellar

The project

Preparation and monitoring of the monument-preserving redevelopment at the Griesinger hospital

Duration

2006 – 2007

Participants

2 women (architect, Dipl.-Ing. process engineering) for the compilation of the BOQ

Contact person

Dipl. Ing. Ute de Nur, architect
Dipl. Ing. Renate Boje

  • Bauschild
  • Kirchturm
  • Eiskeller
  • Griesinger Silhouette

Project target

Supporting of the Lower Monuments Office at the enforcement of the monument-preserving aspects of the redevelopment of the chimney, the former boiler house, the steeple of the hospital’s chapel and the ice cellar at the Griesinger-hospital. Furthermore plans for measures of preserving of the steeple and the ice cellar were to be developed.

Project steps

The job creation scheme for the execution of the monument-preserving works was carried out by G.U.T. Consult GmbH. BAUFACHFRAU Berlin e.V. did the mapping, reconciled available old drawings and compiled the bills of quantity.

The project was funded by

  •  JobCenter Marzahn
  •  UKH Marzahn
  •  Stadtplanungsamt des Bezirkes Marzahn-Hellersdorf von Berlin