Steeple and Ice Cellar

The project

Preparation and monitoring of the monument-preserving redevelopment at the Griesinger hospital

Duration

2006 – 2007

Participants

2 women (architect, Dipl.-Ing. process engineering) for the compilation of the BOQ

Contact person

Dipl. Ing. Ute de Nur, architect
Dipl. Ing. Renate Boje


Project target

Supporting of the Lower Monuments Office at the enforcement of the monument-preserving aspects of the redevelopment of the chimney, the former boiler house, the steeple of the hospital’s chapel and the ice cellar at the Griesinger-hospital. Furthermore plans for measures of preserving of the steeple and the ice cellar were to be developed.

Project steps

The job creation scheme for the execution of the monument-preserving works was carried out by G.U.T. Consult GmbH. BAUFACHFRAU Berlin e.V. did the mapping, reconciled available old drawings and compiled the bills of quantity.

The project was funded by



Dies ist die Druckversion der Seite:  http://www.baufachfrau-berlin.de/en/denkmalpflege/kirchturm-und-eiskeller/